Leading construction firm & trusted development partner.

English
fr-t.jpg
France
de-t.jpg
Germany
sp-t.jpg
Spain

120MW JBIC Wind Fram

Project overview

The 120 MW Zaafrana wind farm was financed by the Japan Bank for International Cooperation (JBIC) and developed by the New and Renewable Energy Authority (NREA), with Gamesa Eólica appointed as turbine original equipment manufacturer. The project comprised approximately 190 Gamesa turbines in the 600 kW to 1 MW range.

Cairo Contracting was selected to deliver the full civil works package, including reinforced concrete turbine foundations, approximately [85 km] of internal access roads and crane pads, medium-voltage collection cable trenching, and civil works for the project substation and control building. The JBIC financing structure imposed additional documentation, quality assurance and reporting obligations, which Cairo Contracting managed in parallel with the physical works programme. The 120 MW project ranked among the largest single wind packages ever delivered in Egypt at the time of completion.

Briefs & Objectives

Objectives

Project Details

Client:

NREA – GAMESA OLICA

Year:

2007

Location:

Zaafrana, Egypt

Service Provider:

Established in 1957, the company was founded with the primary goal of constructing a diverse range of residential and housing complexes, along with complementary works for public buildings, road networks, and other specialized projects.

Phone Number:

+(084) 005-678 99

Email:

info@cairocontracting.com

Location:

2550 Mission St, San Francisco, CA 94110

Follow us on social media