The second phase of the Gabal El Zeit wind complex was developed by the New and Renewable Energy Authority (NREA) with Gamesa Eólica as turbine original equipment manufacturer, financed by the Spanish government through its Fund for International Business Expansion (FIEM). The project comprised 60 Gamesa G80 2.0 MW turbines, delivering an additional 120 MW of installed capacity to the complex.
Cairo Contracting was selected to execute the full civil works scope, including reinforced concrete turbine foundations, approximately [25 km] of internal access roads and crane pads, medium-voltage collection cable trenching, and substation civil works. The construction programme benefited from Cairo Contracting’s deep familiarity with the site geology, logistics corridor and NREA supervisory regime developed during the preceding 200 MW phase. Combined with the Zaafrana programme, the Gabal El Zeit phases consolidated Cairo Contracting’s position as Egypt’s most experienced civil contractor in utility-scale wind generation.
Phase 2 of the Jabal Al Zayt Wind Farm expands one of Egypt’s leading wind energy sites on the Red Sea coast, adding new clean power to the national grid. It builds on the success of the first phase and supports Egypt’s shift to renewable energy, cutting reliance on fossil fuels and lowering carbon emissions. The campaign should present Phase 2 as a landmark of Egypt’s clean-energy future: large in scale, technically advanced, and good for both the country and the planet.
Client:
Year:
Location:
Service Provider:
Established in 1957, the company was founded with the primary goal of constructing a diverse range of residential and housing complexes, along with complementary works for public buildings, road networks, and other specialized projects.
Phone Number:
Email:
Location:
Follow us on social media