Zaafrana Wind Farm Phase 4

Project overview

Phase 4 of the Zaafrana wind complex was developed by the New and Renewable Energy Authority (NREA) with Gamesa Eólica as turbine original equipment manufacturer, marking the introduction of Spanish wind technology to the Egyptian market.

The project comprised approximately 71 Gamesa G52 850 kW turbines. Cairo Contracting was appointed to deliver the full civil works scope, encompassing site grading across the rocky desert terrain, reinforced concrete turbine foundations engineered to the Gamesa loading specification, approximately [35 km] of internal access roads and crane pads, medium-voltage collection cable trenching, and substation civil works tying the new array into the existing electrical infrastructure. Project delivery required close coordination with Gamesa’s erection methodology and meticulous sequencing within a live, operational wind farm.

The successful completion further reinforced the Company’s reputation as Egypt’s pre-eminent civil contractor for wind energy projects

Briefs & Objectives

Objectives

Project Details

Client:

NREA – GAMESA OLICA

Year:

2005

Location:

Zaafrana, Egypt

Service Provider:

Established in 1957, the company was founded with the primary goal of constructing a diverse range of residential and housing complexes, along with complementary works for public buildings, road networks, and other specialized projects.

Phone Number:

+(084) 005-678 99

Email:

info@cairocontracting.com

Location:

2550 Mission St, San Francisco, CA 94110

Follow us on social media